Flags and status changes are held in this browser for this session. A pilot writes them to the shared record.
Birsinghpur 220 kV — 88% night utilisation
OpenNight peak 140.5 MVA of 160 MVA installed, spare 20 MVA — the tightest margin of the 15 monitored nodes.
·
Suggested: Prioritise for augmentation review before next winter peak.
MPPTCL planning · by ingest · 20 Sept, 03:15 pm
Gwalior 220 kV — 85% night utilisation
OpenNight peak 271 MVA of 320 MVA installed, spare 49 MVA.
·
Suggested: Confirm augmentation timeline before next winter peak.
MPPTCL planning · by ingest · 20 Sept, 03:15 pm
Indore 400 kV bay 3 — audible transformer hum reported
AcknowledgedReported by site engineer during routine walk-down, 20 Sep. No MPPTCL loading figure attached — this is a field observation, not a measured value.
Suggested: Schedule thermal imaging inspection within 2 weeks.
MPPTCL Indore O&M · by R. Sharma, MPPTCL Bhopal · 20 Sept, 02:31 pm · this session